Treat the service scope and the South March context as two parts of the same answer. Travel toward Highway 417 can interact with Kanata North employment traffic, while construction or a narrow final approach may add time independent of kilometres. A relevant intersection detail is that confirm lane width, overhead clearance, turning space and a stable vehicle position. For last-minute moving, decision-makers must remain reachable while crew, vehicle and timing options are confirmed. The preparation should include this task: keep key decision-makers available for rapid confirmation For access, customers should confirm driveway width, turning space, surface condition and a safe practical truck position for the South March address. Measure the full driveway and document culverts, slopes, branches, overhead lines and a verified turnaround point. Because actual inventory and packing readiness may shape the estimate, ProMove Ottawa asks for current facts about both properties and revisits the plan when those facts change before the scheduled move.